The interior still pulls on original facets and textures but H2 Yacht Design have changed many things about the decor as well. Overall you will...
The exterior is by Michael Leach but the interior has been changed to H2 Yacht Design which pushed back the project a bit again. At least Project...
85-meter Project 'Victorious' Technically Launched Project 'Victorious' is an 85-meter superyacht currently under construction and has had more...
Definitely not an extension of the bow, not with that tenting and the lack of the required lifting equipment and perhaps she would have had to...
The renderings suggest that the open-air flybridge secondary helm position can be enclosed or left open air should an owner choose that option....
With the latest development the first Bering 107 is still on track for completion by the end of Summer 2022. The yacht is presently under...
First Bering 107 Build Progress Update The first Bering 107 is well underway in construction and YF is reporting back to you with an update on...
In light of a new vessel that is in the process of being uncovered at Blohm + Voss/Lurssen Dock 17 a new thread has been created. Not 100% sure...
Images from the launch.
The first hull of the Mazu 92 DS is already underway with the steel keel laid at this point. It appears the yard will be employing composite...
Halit Yukay who is Mazu's founder suggested that metal construction was inherently safer and has other positive attributes. "In my professional...
Mazu Yachts Offers Steel Displacement Yachts Mazu Yachts is moving up with new designs being presented. With this progression forward it serves...