Click for Glendinning Click for YF Listing Service Click for Westport Click for Delta Click for MotorCheck

| Amels | 74M | "SYNTHESIS" LE242(5) | 2021 |

Discussion in 'Amels Yacht' started by Yacht News, Sep 19, 2020.

You need to be registered and signed in to view this content.
  1. Yacht News

    Yacht News YF News Editor

    Joined:
    Mar 29, 2006
    Messages:
    25,384
    Location:
    Caribbean
    At the private showing held over the last two days at Damen Yachting, a new 74-meter was present alongside. We believe this is the 74-meter "SYNTHESIS"is the 5th LE242 hull. She was launched back in March 2020 and will be delivered in the near future to her owner. The exterior is by Tim Heywood as you would expect while the interior is by Winch Design. SYNTHESIS will have a top speed of 16.5-knots and a cruising range of 5,000 nautical miles at 12.5-knots. There is provision to sleep up to 12 guests with a crew complement of 18 plus the captain.

    Attached Files:

  2. maritimephoto

    maritimephoto New Member

    Joined:
    Feb 19, 2008
    Messages:
    83
    Location:
    near Flushing, Holland
    Admin Edit: Resizing photo

    Attached Files:

  3. Yacht News

    Yacht News YF News Editor

    Joined:
    Mar 29, 2006
    Messages:
    25,384
    Location:
    Caribbean
    "Synthesis" has finally been delivered to her owner. Seems like this one took a while, longer than usual.
  4. maritimephoto

    maritimephoto New Member

    Joined:
    Feb 19, 2008
    Messages:
    83
    Location:
    near Flushing, Holland
    SYNTHESIS seen at Flushing roads 04/01/2021 on her maiden-trip to Gibraltar.

    M2P-074-synthesis_07@maritimephoto-com.jpg
    Last edited by a moderator: Jan 6, 2021
  5. maritimephoto

    maritimephoto New Member

    Joined:
    Feb 19, 2008
    Messages:
    83
    Location:
    near Flushing, Holland
    M2P-074-synthesis_11@maritimephoto-com.jpg
    Last edited by a moderator: Jan 6, 2021
  6. Yacht News

    Yacht News YF News Editor

    Joined:
    Mar 29, 2006
    Messages:
    25,384
    Location:
    Caribbean
    Brand new "Synthesis" in Gibraltar for the first time since departing the yard on her maiden voyage.

  7. Kevin

    Kevin YF Moderator

    Joined:
    Nov 25, 2004
    Messages:
    3,049
    Location:
    Montreal, Qc, Canada
    Production hasn't gone smoothly for many over the past year... even in areas and businesses that can work, supply chain disruptions have hampered getting work done.
  8. Scott W

    Scott W Senior Member

    Joined:
    Apr 11, 2017
    Messages:
    162
    Location:
    Florida
    In the video, there's a small but reasonably pronounced patch of discoloration on the hull, just above the water line before the interior structure begins. Is that exhaust fouling?
  9. Yacht News

    Yacht News YF News Editor

    Joined:
    Mar 29, 2006
    Messages:
    25,384
    Location:
    Caribbean
    If you are referring to the dark coating on the hull that is on the garage door yes that is exhaust soot. Quite common, keeps the crew busy keeping that part of the hull clean.
  10. Yacht News

    Yacht News YF News Editor

    Joined:
    Mar 29, 2006
    Messages:
    25,384
    Location:
    Caribbean
    "Synthesis" heading back into Gibraltar.

  11. Yacht News

    Yacht News YF News Editor

    Joined:
    Mar 29, 2006
    Messages:
    25,384
    Location:
    Caribbean
    "Synthesis" recently arrived in Gibraltar from the Caribbean... here is a look back to her in the Caribbean.

  12. pierberio

    pierberio New Member

    Joined:
    Sep 26, 2009
    Messages:
    79
    Location:
    Venice (Italy)
    Synthesis in Venice, 30th August 2021

    [​IMG]

    [​IMG]

    [​IMG]

    [​IMG]
    Yacht News likes this.
  13. Yacht News

    Yacht News YF News Editor

    Joined:
    Mar 29, 2006
    Messages:
    25,384
    Location:
    Caribbean
    Tuesday 28 November, 74-meter "Synthesis" departs Oceanco, having completed an intense eight-week period of works provided by the company’s Life Cycle Support team. "After a busy summer season spanning from the Med to the Canadian Arctic, Synthesis arrived to Oceanco for a substantial audio upgrade along with a comprehensive maintenance schedule, which was completed within the time frame available to us before departing for the Caribbean."

    Attached Files: