Click for Llebroc Click for Lurssen Click for Abeking Click for Westport Click for JetForums

Suggestions on refitting flybridge helm?

Discussion in 'Technical Discussion' started by Matt46post, Nov 10, 2017.

You need to be registered and signed in to view this content.
  1. Matt46post

    Matt46post Member

    Joined:
    Apr 27, 2015
    Messages:
    163
    Location:
    El dorado hills california
    this really is one of the most unfuctional designs of a flybridge helms I have ever seen, I am going to make helm wheel vertical so it’s not like driving a bus, am thinking about using pipe/tubing mounted nav pods to gauges and a panel, but there is not much space for anything else ...any suggestions woukd be great

    Attached Files:

  2. Capt J

    Capt J Senior Member

    Joined:
    Jul 11, 2005
    Messages:
    9,657
    Location:
    Fort Lauderdale
    Yeah, scrap that pos and build a complete new helm/console out of fiberglass......
  3. Matt46post

    Matt46post Member

    Joined:
    Apr 27, 2015
    Messages:
    163
    Location:
    El dorado hills california
    Capt J your probably right....
  4. SeaLion

    SeaLion Member

    Joined:
    Nov 11, 2013
    Messages:
    50
    Location:
    Ft. Lauderdale
    Maybe go to single lever controls to save real estate.
  5. Matt46post

    Matt46post Member

    Joined:
    Apr 27, 2015
    Messages:
    163
    Location:
    El dorado hills california
    Thanks Sealion
    I am considering electronic controls , these hydrolic controls take two hands to move, I am sure if they are worth rebuilding , can u guys give me recommendations on type of electric controls and what I would expect to pay to rebuild existing controls
  6. RT46

    RT46 Senior Member

    Joined:
    Feb 22, 2011
    Messages:
    957
    Location:
    Long Island, NY
    how about moving the helm back to the area where the stack was and making seating up front, like a SF Tournament bridge.
  7. SeaLion

    SeaLion Member

    Joined:
    Nov 11, 2013
    Messages:
    50
    Location:
    Ft. Lauderdale
    I used Morse cable controls, but Glendinning and Vetus are the electronic control companies that come to mind.
  8. Matt46post

    Matt46post Member

    Joined:
    Apr 27, 2015
    Messages:
    163
    Location:
    El dorado hills california
    That’s a good idea to move it back ,the stack is probably to far back ,I might be able to buy a prefabed fiberglass center console
  9. Matt46post

    Matt46post Member

    Joined:
    Apr 27, 2015
    Messages:
    163
    Location:
    El dorado hills california
    I think the boat is just big to go to cables that’s why it was built with hydrolic /air pressure steering , the yard says they are not working well, would love to have electric ,but saving $5-8k sounds better , especially if it might only take rebuild kits and or O rings to fix what I have , these days everybody wants change everything , I don’t have any experience with these controls ,so I don’t know if they are worth rebuilding
  10. Capt J

    Capt J Senior Member

    Joined:
    Jul 11, 2005
    Messages:
    9,657
    Location:
    Fort Lauderdale
    Hynautic is easy to work with. If everything is moving like it should but is stiff, it's going to be the sintered iron filter that is at the reservoir. Change that and blow out all of the lines and put clean fluid and it will probably be smooth again. O-rings don't make it stiff. Are there cables at the actuators to the engines or does it have the actuators right on the engine and gear?
  11. Matt46post

    Matt46post Member

    Joined:
    Apr 27, 2015
    Messages:
    163
    Location:
    El dorado hills california
    Thanks for the info , I’ll check on the actuators , next time I run up to the boat
    In Seattle , it’s funny how a yard will tell you need to change out a system before they even checked the filters

Share This Page