Click for Mulder Click for Furuno Click for Mulder Click for Cross Click for Ocean Alexander

|Heesen | 50M | "ELA" ex. Project 'Altea' | MAY 2021 |

Discussion in 'Heesen Yacht' started by Yacht News, Apr 23, 2020.

You need to be registered and signed in to view this content.
  1. Yacht News

    Yacht News YF News Editor

    Joined:
    Mar 29, 2006
    Messages:
    25,384
    Location:
    Caribbean
    A new project currently under construction by Heesen is Project 'Altea'. The design will look familiar as we have seen the design in vessels like "Home". The exterior design by Omega Architects and interiors by Cristiano Gatto. She will be able to make a 19.5-knot top end with her MTU powerplants (MTU 12V 2000 M72s) . It offers a range of 3,750 nautical miles with 45,000 LT of fuel onboard. Accommodation is for up to twelve in six cabins, in a full-beam owner’s stateroom, one full-beam VIP suite, two double guest suites and two twin guest suites. Delivery is set for 2021.

    Attached Files:

  2. Yacht News

    Yacht News YF News Editor

    Joined:
    Mar 29, 2006
    Messages:
    25,384
    Location:
    Caribbean
    Another look at the Cristiano Gatto interior.

    Attached Files:

  3. Yacht News

    Yacht News YF News Editor

    Joined:
    Mar 29, 2006
    Messages:
    25,384
    Location:
    Caribbean
    Project 'Altea' should be completed by the end of May 2021, May 28th. According to Heesen the yacht is more than halfway completed with outfitting works taking place after the hull and superstructure were mated. On the yacht exterior the fairing and other prep for the paint process is being done while on the interior things like the insulation, piping, cabling and and outfitting are the current steps.

    Attached Files:

  4. Yacht News

    Yacht News YF News Editor

    Joined:
    Mar 29, 2006
    Messages:
    25,384
    Location:
    Caribbean
  5. Yacht News

    Yacht News YF News Editor

    Joined:
    Mar 29, 2006
    Messages:
    25,384
    Location:
    Caribbean
    We (Heesen) are delighted to announce the sale of Project ALTEA, YN 19550, the second yacht to be built on the Nova Plus design and engineering platform. No word on the final name for this yacht.

    Attached Files:

  6. Yacht News

    Yacht News YF News Editor

    Joined:
    Mar 29, 2006
    Messages:
    25,384
    Location:
    Caribbean
    Her name is "Ela" and you can see her below return from sea trials.

  7. Yacht News

    Yacht News YF News Editor

    Joined:
    Mar 29, 2006
    Messages:
    25,384
    Location:
    Caribbean
    "ELA" has now been delivered. She is to be available for charter this Summer season in the Mediterranean. The yacht was built on speculation as project ALTEA and only was sold in April 2021 to the current owner.
  8. Yacht News

    Yacht News YF News Editor

    Joined:
    Mar 29, 2006
    Messages:
    25,384
    Location:
    Caribbean
  9. Yacht News

    Yacht News YF News Editor

    Joined:
    Mar 29, 2006
    Messages:
    25,384
    Location:
    Caribbean
    Walkthough of "ELA".

  10. Yacht News

    Yacht News YF News Editor

    Joined:
    Mar 29, 2006
    Messages:
    25,384
    Location:
    Caribbean
    "ELA" in Monaco.

  11. Yacht News

    Yacht News YF News Editor

    Joined:
    Mar 29, 2006
    Messages:
    25,384
    Location:
    Caribbean
    "ELA" at night at.