    Looks like Ft. Pierce Superyacht facility is going ahead for Derecktors.

    Derecktor Shipyards’ plan to built a world-class, full-service repair and refit facility for megayachts at Florida’s Port of Ft. Pierce has taken a significant step forward after receiving approval by U.S. authorities.

    The engineering and plans for Derecktor Ft. Pierce’s new 220-foot by 50-foot haul-out basin were approved by the U.S. Army Corps of Engineers after an 11-month review. Approval paves the way for construction to commence once the City of Fort Pierce Building Department gives its final approval.

    New York-headquartered Derecktor Shipyards in April 2019 announced plans to develop and operate the nation’s first maintenance, repair and refit yards designed specifically to accommodate megayachts over 200 feet. The new yard, named Derecktor Ft. Pierce, will provide direct access from the Atlantic through Ft. Pierce inlet, with no overhead obstructions and a maintained depth of 8 meters.

    “Securing a permit from the U.S. Army Corps was no easy feat, especially during a global pandemic, as it required review from several different departments,” said Justin Beard, marketing manager for Derecktor Shipyards. “The haul-out basin is a critical piece of infrastructure at Derecktor Ft. Pierce and it will allow us to lift vessels up to 250 feet in length with our 1,500-ton mobile boat hoist.”

    The $6.5 million, 1,500-ton mobile boat hoist is expected to be shipped from Northern Italy to Port Everglades later this year and will be delivered to Fort Pierce by barge. Assembly of the lift – measuring 85 feet tall, 75 feet wide and 120 feet long – is expected to take 6 to 8 weeks to complete.

    “An extensive amount of engineering and logistics have gone into this project, and we’re looking forward to breaking ground,” Beard said. “Once construction of the haul-out basin begins, it will take 4 to 5 months to complete, so it won’t be long until the shipyard is able to service large yachts on the hard.”

    Beard previously called the Port of Fort Pierce an ideal location for the shipyard as the Fort Pierce Inlet is the widest, deepest, and most navigable inlet between Port Canaveral and Port Everglades. “Deep water access, no overhead obstructions and a generous turning basin provide ample clearance and maneuverability for the global fleet of mega-yachts and large sailing yachts,” explained Beard.
  2. jsschieff

    jsschieff Senior Member

    Joined:
    Apr 3, 2010
    Messages:
    183
    Location:
    Middletown RI/Stuart FL
    It's a great location, straight shot to the yard from the wide Ft. Pierce inlet. Last winter there were several large yachts getting work done there even though the facilities were limited.
  3. bayoubud

    bayoubud Senior Member

    Joined:
    Feb 19, 2017
    Messages:
    1,149
    Location:
    Florida
    Some good boatyards there now. Should bring in more skilled tradesmen. Bought a boat there and hauled at Cracker Boy's yard, all went well.
  4. Capt Ralph

    Capt Ralph Senior Member

    Joined:
    Sep 8, 2004
    Messages:
    12,727
    Location:
    Satsuma, FL
    Everybody has been talking about this project for a while. I feel it's going to be a great spot for Da Big Rigs. Straight in thru a decent inlet.
  5. JWY

    JWY Senior Member

    Joined:
    Feb 22, 2004
    Messages:
    1,513
    Location:
    Ft. Lauderdale
    I don't want to side-track this thread, but I am currently dealing with Derecktor in Dania Beach regarding a pre-purchase survey haulout on a 90' motoryacht. They have responded expediently, professionally, and couldn't be more accommodating, nicer, or easier to deal with.

    Big thumbs up!

    Judy
    MSD likes this.
  6. Capt Ralph

    Capt Ralph Senior Member

    Joined:
    Sep 8, 2004
    Messages:
    12,727
    Location:
    Satsuma, FL
    Derecktor/Dania Has always been a great resource for us (little guys) and our customers.
    I miss peeking in their yard to see the next project in process.

    I can easily see more than double the labor force at the new facility. Wish them great success.
    Last edited: Oct 22, 2020