Here is a look at the third Yacht Support 53-meter. She has now been put to the water and joins the slightly earlier sisterships of the class "Bad Company Support" and "Five Oceans". Delivery of 5303 is Summer 2025.
Love how the Damen project manager said “She is the third from this all-new YS53 design and is a great example of our Yacht Supports which are built for purpose and non-stop reliability” when Bad Company Support 175 has been nothing but problems.
Blew one of the engines during sea trials. Did a whole rebuild and then blew it again. Had to have the whole engine replaced. I believe this was about a 6 month ordeal. A couple other issues happened but the latest is the fresh water main broke and flooded all the guest accommodations. I think it will be 6 months to remediate all the damage from this.
Wow Sheet. That was a bad start to a new build. I can understand quickly if the new boat owner is a lil bummed. Can you please keep us up on her progress? Maybe a new thread? I remember the early support boats converting from offshore oil rig supply boats. I luved the work they did on what they started with. Always kept an eye open on these all new builds. It is real hard to call these new rigs "Support Vessels" when they look better (to me) than what they are supposed to be supporting. Cheers
"Bad Company Support" has her own thread, you all can continue to discuss the issues in that thread. https://www.yachtforums.com/threads/damen-yachting-53m-bad-company-support-2023.37360/#post-353012