| Sint Maarten Bridge Times - Winter Schedule
The John Sainsborough Lejuez Bridge is now operating on the "Winter" schedule. Daily outbound openings are at 9:00AM, 11:00AM and 4:30PM . Daily inbound openings are at 9:30AM, 11:30AM and 5:30PM.
Should you need the bridge to open other than at scheduled times, you need to pay a US$300.00 fee to the Simpson Bay Lagoon Authority at the Police Station in Simpson Bay at least 24 hours in advance. Maximum 56.5 feet beam and a draft of 20 feet
The bridge operator monitors VHF channel 12.
__________________ I remember the day I bought it and the day I sold it |