Click for NVTI
Click for Dyna
Click for Oceanco
Click for ISA
Click for Westport
Click for Queenship
Go Back   YachtForums.Com > YACHT & BOAT FORUMS > Motor Yachts > Delta Yacht > Delta Yachts Expanding

Login to YachtForums
Username
Password

Reply

Delta Yachts Expanding

 
 
Thread Tools Rate Thread Display Modes
Old 02-14-2005, 09:58 AM   #1
YachtForums
Publisher/Administrator
 
YachtForums's Avatar
 
Join Date: Dec 2002
Location: South Florida
Posts: 9,877
Delta Yachts Expanding

DELTA EXPANDS FACILITY TO ACCOMMODATE MORE AND LARGER PROJECTS...

Seattle, January 2005—Delta will complete construction of a new high-bay manufacturing and assembly building early in the first quarter of 2005. The new building is part of a three-phase expansion project that began in 2003.

Phase one of the expansion included the installation of a 400-ton Marine Travelift and boat lift pier to service the increasing demands of the Refit and Repair Division. Phase two includes the construction of a new high-bay assembly building, the addition of seven acres of land and the purchase of state-of-the-art machinery and equipment. Phase three will complete the project and include new offices for the in-house Delta Design Group, project management and the Refit and Repair Division. The entire project will increase total acreage to twenty-five acres and total enclosed manufacturing space to over 275,000 square feet.

The new building will measure 360’L x 126’W x 86’H and serve both the new construction and refit divisions. Delta’s new construction schedule includes some of the largest yachts to be built in the United States since the 1920’s. With projects continuing to increase in length, this new building will allow Delta to commission projects, both new construction and refit, up-to 100 meters.

In addition to larger projects, the new building will allow Delta to accommodate more projects simultaneously. Equipped with two 15 ton bridge cranes, fully operable rolling doors at both ends and the latest in air handling and ventilation, the building will accommodate up to four 50 meter projects at one time and nearly double the total capacity of the facility.

Function and flexibility are at the heart of this project. “The design focused around increased efficiency and the best working conditions possible for our employees,” said Ivor Jones. “We built a balcony extending the entire length of the building at boat deck height”. The balcony, with workstations for marine carpenters, mechanics and electricians will allow the workers to move parts and equipment easily onto the vessel during construction. These stations will be fully enclosed to keep dust out of the building and the vessel itself. In addition, a complex air handling system has been designed to control the temperature of the building and also control the temperature of the working condition inside the vessel. “We will be able to heat the yacht in the winter months or keep it cool in the summer,” says Jones.
Attached Images
YachtForums is online now   Reply With Quote
Old 02-14-2005, 09:59 AM   #2
YachtForums
Publisher/Administrator
 
YachtForums's Avatar
 
Join Date: Dec 2002
Location: South Florida
Posts: 9,877
Phase two also includes the addition of seven acres of land adjacent the facility. This property will be used for the future expansion of trade workshops and provide an immediate solution to the increasing demands of the Refit and Repair Division. The Refit and Repair Division will be able to increase its boat storage capacity, have more covered area to work on vessels and will gain a second Travelift pier to accommodate smaller vessels up to 50 tons. This addition will provide it a working environment that again, lends itself to function and flexibility.

About Delta...

Luxury. Elegance. Perfection. Delta creates luxury yachts for those who recognize and expect the very finest the world has to offer. Complete with a team of naval architects, marine engineers and skilled workers with years of experience in specialized fields, Delta expertly combines old-world craftsmanship and the latest technology.

For more information, visit their website at www.deltamarine.com.
Attached Images
YachtForums is online now   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is Off
HTML code is Off
Forum Jump


All times are EST. The time now is 03:06 PM.

Click for ISA
Click for Burger
Click for Nautical Structures
Click for Christensen
Click for Horizon
Click for NorthCoast


Powered by vBulletin Version 3.5.4
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 2.3.3