|
The Dilbar was placed on 192 wheels!! She left at 06.00 from Oceanco. She passed without any problems the bridges from Rotterdam. at 11.00 she arrived in the Wilton harbour. There the tractors drove on to the smaller ponton Skyline Barge 10. That ponton sunk slowly so the Dilbar floated in the water. 2 tugs brought her back to Alblasserdam. From there she made 1st of april her first river trial. Pics from the interior of the Dilbar will follow soon.
|